2024 Rides and Events

All Sunday rides, except out-of-town rides, leave from the Coffee Bean & Tea Leaf, 13420 Maxella Ave, Villa Marina Marketplace.  Most people ride to the start, but some drive and park on nearby streets.

Sunday departure time is 8:00 am, except for out-of-town rides. Please be ready to roll at the departure time!

Your bike should be in good working condition and you should be prepared to fix a flat (i.e., have spare tube, tire levers, patches, pump or CO2 inflator, etc.).  You should also carry a water bottle (two in warm weather), snacks, and lunch money. Helmets are required at all times, and no headsets or earbuds, please!

This schedule is always subject to change.  As a convenience to riders, it may include  mention of and links to other organized rides that some of us participate in, but these are not “official” or “out-of-town” MDRCC rides.

Please, no E-Bikes.  This group is somewhat traditional and part of the reason people ride with us is for the fitness it brings under their own power.

IMPORTANT RIDE CAVEAT – Riding on public roads with motor and pedestrian traffic, road hazards, and other cyclists is inherently dangerous and because of this, accidents and serious injuries might occur. By riding with MDRCC, you acknowledge and accept these risks and release MDRCC and all others involved from any and all liability.

Event Information:

  • Sun
    04
    Jul
    2021

    (OPTIONAL) GMR to Baldy Village (out-of-town)

    8:00 amEncanto Park in Duarte

    Glendora Mountain Road and Glendora Ridge Road are traditionally closed to vehicular traffic on the July 4th weekend, and consequently has become a common bike ride for many. I was asked to mention it. Please coordinate with whoever wants to do the route. You can also start at Pioneer Park in Azusa, or even at the base of GMR!

    The bike route is shown on this MapMyRide link:

    http://www.mapmyride.com/route/us/ca/azusa/149128928338962270

    This spectacular ride is about 56.5 miles long, and if you click on the Show Elevation box, you'll see that it's mostly uphill on the way out and mostly downhill on the way back. Funny how that works! About 4800 feet of climbing. The steepest sections are shown as 6% and the pavement is generally good.

    Ride start is at 8:00 am (be ready to roll at 8:00 am, not just arriving!) from Encanto Park in Duarte. This is a convenient and pleasant starting point and allows about 6.5 miles of warm-up before the real fun begins. Allow about 40 minutes from the 10/405 (SM/SD) freeway intersection. A suggested route to get there is shown on this link:

    http://www.mapmyride.com/route/us/ca/los%20angeles/800128928615290327